<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>Indiana Contractors Hub: Contracts &amp; deposits</title>
    <link>https://swiftagentsites.com/hubs/indiana/contractors/contracts/</link>
    <description>Contractors: Contracts &amp; deposits, from the Indiana regional hub.</description>
    <language>en-us</language>
    <lastBuildDate>Thu, 12 Nov 2026 14:00:00 GMT</lastBuildDate>
    <atom:link href="https://swiftagentsites.com/hubs/indiana/contractors/contracts/feed.xml" rel="self" type="application/rss+xml"/>
    <item>
      <title>Indiana Home Improvement Contracts Over $150: A Written Contract and a Three-Business-Day Cancellation Right</title>
      <link>https://swiftagentsites.com/hubs/indiana/contractors/home-improvement-contracts-three-business-day-cancellation/</link>
      <guid isPermaLink="true">https://swiftagentsites.com/hubs/indiana/contractors/home-improvement-contracts-three-business-day-cancellation/</guid>
      <atom:link href="https://swiftagentsites.com/hubs/indiana/contractors/home-improvement-contracts-three-business-day-cancellation/" rel="canonical"/>
      <pubDate>Thu, 12 Nov 2026 14:00:00 GMT</pubDate>
      <description><![CDATA[For most Indiana home-improvement contracts on a 1-4 unit dwelling priced over $150, the supplier must give a completed written contract before you sign. On contracts after June 30, 2017, you may cancel before midnight of the third business day after you sign, or after a later insurer determination.]]></description>
      <content:encoded><![CDATA[<h1>Indiana Home Improvement Contracts Over $150: A Written Contract and a Three-Business-Day Cancellation Right</h1>
<figure><img src="https://images.unsplash.com/photo-1673870861507-d72aa6855d89?fm=jpg&amp;q=80&amp;w=1600" alt="A person painting an interior wall, a reminder that Indiana home-improvement contracts over $150 generally include a three-business-day cancellation right" loading="lazy"><figcaption>Photo by <a href="https://unsplash.com/@tonchik?utm_source=swift_agent_sites&amp;utm_medium=referral">Anton Savinov</a> on <a href="https://unsplash.com/photos/a-man-holding-a-wrench-in-front-of-a-wall-of-tools-Cx5Lk7Rv-vE?utm_source=swift_agent_sites&amp;utm_medium=referral">Unsplash</a></figcaption></figure>
<p>For most home-improvement contracts on a 1-4 unit Indiana dwelling priced over $150, the supplier must give you a completed written contract before you sign. On contracts after June 30, 2017, you may cancel before midnight of the third business day after you sign, or after a written insurer determination if that later date applies.</p>
<p>Indiana Code 24-5-11 is the statute. Keep a signed copy, and use written notice if you cancel.</p>
<h2>What the written contract must include</h2>
<p>The chapter applies to alteration, repair, replacement, reconstruction, or other modification of residential real property with one to four units, used in whole or in part as a dwelling, when the contract price exceeds $150. That price, for this threshold, excludes financing charges, taxes, and governmental fees as the statute describes. A "supplier" is the person who sells or furnishes the improvement. Before the consumer signs, the supplier must provide a completed written contract in a form the consumer can read, with:</p>
<ul>
<li>The name and address of the supplier, and, for contracts entered after June 30, 2017, an email address.</li>
<li>Telephone or other contact information listed in the chapter.</li>
<li>The date of the contract.</li>
<li>A reasonably detailed description of the work.</li>
<li>Start and completion dates, and any contingencies that could change them.</li>
<li>The contract price, and a statement about third-party labor if the statute requires it.</li>
<li>Signature lines for the supplier and the consumer.</li>
</ul>
<p>The supplier must sign the contract before the consumer can be required to make a down payment, and must give the consumer a fully executed copy. Do not start a down payment on a blank or incomplete form. If the work is a kitchen, roof, HVAC replacement, or similar project over $150, ask for the full written contract first.</p>
<h2>How the three-business-day cancellation works</h2>
<p>IC 24-5-11-10.6 gives the consumer a right to cancel a real property improvement contract entered into after June 30, 2017, before midnight on the third business day after the later of (A) the date the consumer signs the contract or (B) if applicable, the date of a written insurer determination of whether the claim or contract is a covered loss. Notice of cancellation may be given by mail, and is effective on deposit in the mail, or by email. The statute requires a specified cancellation-notice form to appear in the contract.</p>
<p>After a valid cancellation, the supplier is to return payments and deposits. Section 10.6(d) refers to return "within ten (10) days." The required notice form printed in the same section refers to "ten (10) business days." Read both sentences on your contract, and calendar the later date if the two phrases could be read differently, rather than assuming they are identical.</p>
<p>There is a limited exception for the reasonable value of emergency or temporary services that the consumer acknowledged in writing, beforehand, as necessary to prevent damage to the real property. A contractor cannot use a vague "emergency" label to erase the cancellation right on ordinary remodeling. If you agree to emergency board-up or water extraction, put that acknowledgment in writing and keep the scope narrow.</p>
<p>If a supplier refuses to provide a written contract, demands a large cash deposit before you have a signed copy, or ignores a timely cancellation, write to the company and then to the Attorney General's Consumer Protection Division, 1-800-382-5516. Local building permits and, for plumbing, a Professional Licensing Agency license check, are separate steps that still apply.</p>
<p>Use the cancellation window only in writing, and send the notice in a way you can prove: mail it and keep the receipt, or email it to the address in the contract and keep the sent message. Do not rely on a phone call alone. If work has not started, cancellation should be straightforward. If emergency work was already performed under a written acknowledgment, expect to pay the reasonable value of that temporary work as the statute allows, and still cancel the remainder if you are within the period. Keep the Attorney General's Consumer Protection Division number, 1-800-382-5516, and the IC 24-5-11 chapter PDF, with your contract file. Local permits and, for plumbing, a Professional Licensing Agency license check, remain separate obligations even after a contract is signed or cancelled.</p>
<p>Read the start and completion dates, the price, and any contingency language before you sign, and do not let a salesperson fill those blanks later. If a change-order is needed after work begins, get it in a signed writing that still fits the chapter's contract rules. Keep cancelled checks or card statements with the contract so you can show what was paid if a cancellation refund is late.</p>
<h2>FAQ</h2>
<h3>When does the written-contract rule apply?</h3>
<p>Generally when the contract is for a real property improvement on a 1-4 unit dwelling and the price exceeds $150, under IC 24-5-11.</p>
<h3>How long do I have to cancel?</h3>
<p>For contracts after June 30, 2017, you may cancel before midnight of the third business day after you sign, or after a written insurer determination if that later date applies.</p>
<h3>How do I cancel?</h3>
<p>Give written notice by mail (effective when deposited) or by email, using the cancellation form the contract is required to include. Keep a copy.</p>
<h3>How soon must a deposit be returned after I cancel?</h3>
<p>The statute's section 10.6(d) says within ten days, while the required notice form refers to ten business days. Read both, and follow up in writing if the refund is late.</p>
<h2>Next step</h2>
<p>Insist on a completed, signed contract before any down payment, calendar the three-business-day cancellation window, and contact the Attorney General's Consumer Protection Division or a licensed local agent if a contractor will not follow the statute.</p>
<p><em>Sources: <a href="https://iga.in.gov/ic/2025/Title_24/Article_5/Chapter_11.pdf">Indiana Code 24-5-11, Home Improvement Contracts</a>; <a href="https://www.in.gov/attorneygeneral/consumer-protection-division/">Indiana Attorney General, Consumer Protection Division</a>.</em></p>]]></content:encoded>
    </item>
  </channel>
</rss>
