<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>Alabama Contractors Hub: Complaints &amp; recovery</title>
    <link>https://swiftagentsites.com/hubs/alabama/contractors/complaints/</link>
    <description>Contractors: Complaints &amp; recovery, from the Alabama regional hub.</description>
    <language>en-us</language>
    <lastBuildDate>Mon, 16 Nov 2026 19:15:00 GMT</lastBuildDate>
    <atom:link href="https://swiftagentsites.com/hubs/alabama/contractors/complaints/feed.xml" rel="self" type="application/rss+xml"/>
    <item>
      <title>Alabama Homeowners&apos; Recovery Fund: Lawsuit First, Then a 10-Day Notice</title>
      <link>https://swiftagentsites.com/hubs/alabama/contractors/alabama-homeowners-recovery-fund-lawsuit-first-10-day-notice/</link>
      <guid isPermaLink="true">https://swiftagentsites.com/hubs/alabama/contractors/alabama-homeowners-recovery-fund-lawsuit-first-10-day-notice/</guid>
      <atom:link href="https://swiftagentsites.com/hubs/alabama/contractors/alabama-homeowners-recovery-fund-lawsuit-first-10-day-notice/" rel="canonical"/>
      <pubDate>Mon, 16 Nov 2026 19:15:00 GMT</pubDate>
      <description><![CDATA[Alabama's fund can pay up to $30,000 per transaction, but only after a court judgment and a certified-mail notice to the Board.]]></description>
      <content:encoded><![CDATA[<h1>Alabama Homeowners' Recovery Fund: Lawsuit First, Then a 10-Day Notice</h1>
<p>Alabama's Homeowners' Recovery Fund, run by the Home Builders Licensure Board, is for homeowners harmed by a licensed residential home builder. The Board says a consumer complaint alone does not make you eligible. You need a civil lawsuit, and you have to notify the Board by certified mail within 10 days of filing it.</p>
<h2>What does the fund cover?</h2>
<p>The Board's page says payment comes only after a court judgment, and consent judgments do not count. Payment is limited to actual economic damages. Pain and suffering, mental anguish, loss of consortium, interest, attorney's fees and court costs are excluded.</p>
<p>The limits: up to $30,000 for a single transaction, and no more than $90,000 total for the actions of one licensee.</p>
<h2>What are the steps?</h2>
<ol>
<li><strong>File a civil lawsuit</strong> against the licensed builder. The Board recommends talking to a private attorney about the lawsuit and the fund process.</li>
<li><strong>Notify the Board within 10 days of filing.</strong> Send a certified-mail letter stating your claim, with a copy of the court complaint. Do not name the Board as a party to the lawsuit.</li>
<li><strong>File a consumer complaint</strong> with the Board.</li>
</ol>
<p>After the Board gets your notice, it provides the Homeowner's Recovery Fund Regulations, which set out the procedure for making a claim.</p>
<h2>Is there a time limit?</h2>
<p>The Board says a consumer complaint must be filed within six years of substantial completion of construction, or within six years of when the original homeowner took possession of the residence. Count from those dates, not from the day you noticed the problem.</p>
<h2>Which builders are covered?</h2>
<p>The page describes claims against licensed residential home builders. It does not address claims involving unlicensed builders. Homeowners also cannot claim against the fund for the actions of a licensee holding a residential roofers license, under Alabama Administrative Code rule 465-X-7-.01. If your contractor was unlicensed or was a roofer, ask the Board whether the fund can help before you spend money on a lawsuit.</p>
<h2>How do I check the license first?</h2>
<p>Before you sign a contract, search the Board's license lookup for the builder and write down the license number and its status. Doing that before you pay also tells you whether the fund could ever apply.</p>
<h2>What should I keep?</h2>
<ul>
<li>The signed contract, with the builder's license number on it.</li>
<li>Every payment record.</li>
<li>Dated photos and written repair estimates.</li>
<li>The certified-mail receipt for your notice to the Board.</li>
</ul>
<p>The Board's phone number for questions is 334-242-2230.</p>
<h2>FAQ</h2>
<h3>Does a consumer complaint alone qualify me?</h3>
<p>No. The Board says a civil action is required.</p>
<h3>Are consent judgments accepted?</h3>
<p>No. The Board says payment comes only after a court judgment, and consent judgments do not count.</p>
<p><em>Sources: <a href="https://hblb.alabama.gov/faq/how-do-you-access-the-fund/">Alabama HBLB, How do you access the fund?</a>; <a href="https://hblb.alabama.gov/consumers/recovery%20fund/">HBLB, Recovery Fund</a>. Confirm current limits with the Board before you file.</em></p>]]></content:encoded>
    </item>
    <item>
      <title>Alabama Licensed Residential Builders Must Use a Written Contract and Disclose Liability Insurance</title>
      <link>https://swiftagentsites.com/hubs/alabama/contractors/residential-builder-written-contracts-insurance-disclosure-and-recovery-fund/</link>
      <guid isPermaLink="true">https://swiftagentsites.com/hubs/alabama/contractors/residential-builder-written-contracts-insurance-disclosure-and-recovery-fund/</guid>
      <atom:link href="https://swiftagentsites.com/hubs/alabama/contractors/residential-builder-written-contracts-insurance-disclosure-and-recovery-fund/" rel="canonical"/>
      <pubDate>Thu, 12 Nov 2026 14:00:00 GMT</pubDate>
      <description><![CDATA[Alabama licensed residential builders must use a written contract under section 34-14A-7 and disclose liability insurance in a witnessed writing before work starts. The Homeowners' Recovery Fund can pay up to $30,000 per transaction and $90,000 per licensee after a qualifying court judgment.]]></description>
      <content:encoded><![CDATA[<h1>Alabama Licensed Residential Builders Must Use a Written Contract and Disclose Liability Insurance</h1>
<figure><img src="https://images.unsplash.com/photo-1567954970774-58d6aa6c50dc?fm=jpg&amp;q=80&amp;w=1600" alt="A red hard hat on pavement, used here to illustrate Alabama residential-builder contracts and the Homeowners&#x27; Recovery Fund" loading="lazy"><figcaption>Photo by <a href="https://unsplash.com/@umityildirim?utm_source=swift_agent_sites&amp;utm_medium=referral">Ümit Yıldırım</a> on <a href="https://unsplash.com/photos/red-hard-hat-on-pavement-9OB46apMbC4?utm_source=swift_agent_sites&amp;utm_medium=referral">Unsplash</a></figcaption></figure>
<p>An Alabama licensed residential builder has to use a valid written contract, under section 34-14A-7(f). Before work starts, section 34-14A-19 requires a written disclosure of whether the builder maintains liability insurance, signed by both parties and attested by one witness the homeowner selects.</p>
<p>Those two writings are official consumer protections, and they are not optional formalities. If a person offers to start a remodel on a handshake, or cannot produce a current HBLB license, stop and verify the license on the official board site, or by calling 1-800-304-0853 if the web list is unavailable. A contract with an unlicensed residential builder also has a hard legal consequence: the unlicensed builder may not bring or maintain an action to enforce that contract, under section 34-14A-14.</p>
<h2>What should the written contract and insurance disclosure contain?</h2>
<p>The statute requires a valid written contract. It does not, in the text reviewed here, prescribe a state fill-in form or a maximum deposit percentage. Put the legal name and license number, the address of the property, a description of the work, the price, the payment schedule, the start and completion expectations, and change-order rules in the contract you actually sign. Keep a copy.</p>
<p>The insurance disclosure is more specific. It has to be in writing, it has to state whether the builder currently maintains liability insurance, it has to be signed by the builder and the homeowner, and it has to be attested by one witness selected by the homeowner. Failure to comply is a violation of the chapter and can be punished by the board under section 34-14A-8. The disclosure is not the same thing as a certificate of insurance. Ask for the current certificate as well, and confirm that the name matches the license.</p>
<p>If the work will go beyond the applicable building code and follow a resiliency program, section 34-14A-7(g) requires the licensee to disclose that compliance to the homeowner in writing before the work starts. Building permits remain a local matter, and officials are directed not to issue a permit for work that requires a license unless the applicant shows a license or an exemption.</p>
<h2>How does the Homeowners' Recovery Fund work?</h2>
<p>The board may establish a Homeowners' Recovery Fund under section 34-14A-15. Official board materials and Alabama Administrative Code Rule 465-X-7-.02 state the current payment caps: payments for claims arising out of the same transaction shall not exceed $30,000 in the aggregate, and payments for claims based on judgments or settlements against any one licensee shall not exceed $90,000 in the aggregate. Payment is for actual economic damages only, not interest, court costs, pain and suffering, mental anguish, loss of consortium, or attorney fees.</p>
<p>A homeowner cannot make a claim against the fund based on the actions of a licensee holding a residential roofers license, under Rule 465-X-7-.01 as the official Recovery Fund page explains. Consent judgments do not qualify. The licensed home builder must have been licensed at the time of the contract and at the time of the conduct. Filing a consumer complaint with the board is required as part of the path, but it is not enough by itself. The homeowner has to obtain a valid court judgment, excluding a consent judgment, and then follow the fund's notice and collection steps.</p>
<p>Official timing rules include these points:</p>
<ul>
<li>Submit the board consumer complaint within six years of substantial completion or of the date the original homeowner took possession.</li>
<li>When a civil action is filed that may result in fund liability, notify the board by certified mail at that time, not later than 10 days from the date the complaint is filed, and include a copy of the civil complaint. Do not name the board as a party.</li>
<li>After a final qualifying judgment, make reasonable efforts to collect, then file a verified claim in the same court and give the board 30 days' written notice before applying for an order directing payment from the fund.</li>
</ul>
<p>If the fund pays, the board may revoke the license and may refuse to issue a new license until the former licensee repays the fund in full plus interest at 12 percent a year. A discharge in bankruptcy does not relieve those penalties. If the fund balance is insufficient, unpaid claims wait, in the order filed, until money is available.</p>
<h2>What should you do before work starts?</h2>
<p>Verify the license, sign a written contract, complete the witnessed insurance disclosure, and ask the county or city about permits. If a dispute later arises, use the six-year consumer-complaint window and get legal advice before you file a lawsuit if you hope to preserve a fund claim. Roofing jobs above $2,500 still require the proper license, but they are outside the fund according to the official rule cited above.</p>
<p>If you are hiring an Alabama residential builder or remodeler, talk with a licensed local agent about whether the project affects your homeowners coverage, and do not start work without the official written contract and insurance disclosure.</p>
<h2>FAQ</h2>
<h3>Does Alabama require a written residential-builder contract?</h3>
<p>Yes. Section 34-14A-7(f) requires each licensee to use a valid written contract when engaging in the business of residential home building.</p>
<h3>What insurance disclosure is required?</h3>
<p>Before work begins, the builder must disclose in writing whether the builder has and is maintaining liability insurance. The homeowner and the builder sign it, and one witness selected by the homeowner attests it, under section 34-14A-19.</p>
<h3>How much can the Homeowners' Recovery Fund pay?</h3>
<p>Official Rule 465-X-7-.02 and the board's Recovery Fund page cap payments at $30,000 for claims arising out of the same transaction and $90,000 in the aggregate against any one licensee, for actual economic damages after a qualifying non-consent judgment.</p>
<h3>Does the fund cover a licensed roofer?</h3>
<p>No. The official Recovery Fund page states that a homeowner cannot make a claim against the fund based on the actions of a licensee holding a residential roofers license.</p>
<p><em>Sources: <a href="https://hblb.alabama.gov/law/">Home Builders Licensure Law</a>, <a href="https://hblb.alabama.gov/consumers/recovery-fund/">HBLB Recovery Fund</a>, <a href="https://admincode.legislature.state.al.us/administrative-code/465-X-7-.02">Alabama Administrative Code Rule 465-X-7-.02</a>, <a href="https://alhobv7prod.glsuite.us/GLSuiteWeb/Clients/ALHOB/Public/LicenseeSearch.aspx">HBLB licensee search</a>.</em></p>]]></content:encoded>
    </item>
  </channel>
</rss>
